


How a Custom Silver Piece Is Developed
The workflow runs drawing, mould, first sample, correction and approval. Each step has a defined output, which is what keeps a custom piece from drifting between the brief and the finished item.
What You Need to Send
A drawing or reference image, the centre stone size, the plating you want, and the target retail price. If a reference piece already exists, a physical sample shortens the process considerably.
Where Customisation Pays Off
Custom work earns its cost when a shape, finish or setting is not available in a catalogue and matching it matters to the assortment.
925Sterling silver hallmark on every piece
1–2 daysStock preparation
5–7 daysNew production after approval
OEM / ODMPrivate label ready
Customisation Questions
How long does a custom silver piece take?
Allow for drawing and mould work before sampling; new production itself runs about 5–7 working days after approval.
Can you copy an existing piece?
A reference piece can be followed closely, but exact duplication of another brand’s design is not something we produce.
Do we approve a physical sample?
Yes — approval is given on a physical sample, not on a drawing alone.
Related Silver Pages
Send Your Customisation Brief
Category, centre stone size and target retail price are enough to come back with a costed configuration.